The overall manufacturing planning process is comprised of:

The forecast values and requirements from the sales information system and costing/profitability analysis are inputs to the Sales and Operations Planning (SOP) phase in which independent requirements are determined.
Master Schedule items (those items that greatly influence profits or consume critical resources ) are planned. Planning the master schedule items separately leads to a reduction in stock levels and improved delivery performance.
Materials requirements planning (MRP) is the final step in the planning process. The output of MRP is either a planned production order, a purchase requisition, or a planned purchase order.
The overall manufacturing execution process is comprised of:

Production orders are released
Materials are issued
Completion confirmations are performed
Goods are received into stock.
The manufacturing process affects capacity, costing inventory, reporting, and analysis.

The five primary phases are:

Sales and operations planning
Demand management
Master production planning
Materials requirements planning
Production order execution
Sales and Operations Planning (SOP)
The forecast values and/or requirements from customer order management, sales information system, and controlling are inputs to the sales and operations planning phase.

The main steps in sales and operations planning are:

Creating a sales and production plan--Methods
Manual entry
Forecast of consumption
Copying data from financial modules
Copying data from the sales information system
transferring product group
Disaggregating the planning values
Transferring the planning values to demand management
There are four ways to create a production plan in the system.

Based on sales
Based on target inventory
Based on current days of sales supply
Based on running down the inventory to zero (Just in Time or Kanban)
Demand Management
Demand management links top-level requirements planning (SOP) with materials planning (MPS and MRP)

Demand Management determines the requirements dates and quatities for important assemblies and specifies the strategies for planning and producing or procuring finished products.
The result of Demand Management is the demand program
The demand program distinguishes planned independent requirements and customer independent requirements
The requirements can then be transferred to MPS or directly to MRP depending on the MRP type selected in the material master of the material.
MPS Master Production Scheduling
The independent requirements from Demand Management initiate the master scheduling process for MPS designated items

The master production schedule is the anticipated build schedule (high level)

The purpose of MPS and MRP is to guarantee availablility
The MPS run results in planned orders for the master schedule items and dependent requirements for the level directly below the MPS items.
MPS = Finished goods level only
MRP Materials Requirements Planning
In material requirements planning (MRP), the system calculates the net requirements while considering available warehouse stock and scheduled receipts from purchasing and production.
The uses of MRP are as follows:
MRP is used to plan the on time production or procurement of the required quantities for both internal consumption and customer demand.
This process involves monitoring stock levels and automatically creating order proposals for purchasing and production.
For materials produced in-house, the dependent requirements of teh conponenets are determined during BOM explosion.
BOM explosion is the process by which the system calculates the componenets or assemblies required to produce the material.
MRP requires exact requirement quantities, which allows you to work with particularly low safety stocks.
The output of MRP is either a planned production order, a purchase requisition, or a planned purchase order.
A planned order can be converted to a production order (for materials produced in-house) or a purchase requisition for procured materials.
MANUFACTURING EXECUTION
Manufacturing Execution is intitated by releasing each production order to the shop floor.

Production Orders: Contents
Production orders are used:
To control and monitor production within a factory
As a controlling instrument for cost accounting
The production order displays:
what and how much is to be produced (including duration)
when production is to be executed
what is required for production (components, resources)
which method of production to be used
the capacities required e.g. machine, labor
production costs
Production Order Execution Process
Production orders go through a series of steps including:
Production order release
Goods issue (issuing the components or raw materials)
Completion confirmation confirming that the final material is complete
Goods receipt (receiving the finished good back into inventory)
Order settlement
gopalakrishna is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump



All times are GMT +5.5. The time now is 11:22 PM.
NSE BSE Sensex IPO Shares Review Bull Bear Mutual Fund Capital Equity F&O Investments



Powered by vBulletin Copyright © 2000-2008 Jelsoft Enterprises Limited.

Search Engine Optimization by vBSEO 3.2.0